Back to All Events

Construction Site Tour of The Gateway at UC Berkeley

  • The Gateway Project Site at UC Berkeley 2300 Hearst Avenue Berkeley, CA, 94703 United States (map)

Experience an exclusive behind-the-scenes look at The Gateway, UC Berkeley's first new college in 50 years, as it's being constructed by Turner Construction. This tour offers a unique opportunity to explore a landmark project that will transform the future of data science, computing, and interdisciplinary research. Whether you’re passionate about construction, design, or simply curious about the future of education, this event promises to be both informative and inspiring. After the tour, enjoy networking and socializing with a vibrant community of professionals in a relaxed setting.

Please note the following details about this event:

  • All attendees will be required to sign a visitor waiver with Turner Construction upon arrival before being permitted to the project site.

  • You must bring your own PPE Equipment including a minimum of safety vest, hard hat, and closed-toed shoes with ankle support.

  • Access to the site is allowed only through the site office located at Wellman Courtyard Parking Lot.

  • The Downtown Berkeley BART station is a 10-minute walk away. While parking can be challenging, street parking may be available nearby. Additionally, paid parking is available on campus or in nearby garages within walking distance.

NOTE: times shown are meant to be Pacific Time!

Advanced Registration Required

Space is limited to 30 people for this project tour, on a first-come basis. Advanced registration is required to participate and walk-ins will not be allowed. Be sure to sign-up before spaces fill up!

 

What To Expect

  • Exclusive Access :: Get a rare opportunity to explore the construction site of a groundbreaking academic building before its completion.

  • In-Depth Insights :: Learn about the innovative design and construction techniques directly from the experts at Turner Construction.

  • Networking Opportunities :: Connect with LGBTQ+ professionals and allies from the design, engineering, and construction industries.

  • Future Vision :: Discover how The Gateway will shape the future of education and research at UC Berkeley.

  • Relaxed Socializing :: Unwind and continue the conversation at a local bar with fellow attendees after the tour.

 

About The Gateway Project

Rendering by Weiss/Manfredi.

The Gateway at UC Berkeley is an ambitious project that will house the College of Computing, Data Science, and Society (CDSS), making it the first new college at the university in 50 years. Located at the prominent corner of Hearst Avenue and Arch Street, this 367,270-square-foot facility is designed to foster collaboration among faculty, students, researchers, and staff. The building will feature state-of-the-art research laboratories, classrooms, seminar rooms, a public café, and a rooftop event space. Expected to open during the 2025-2026 academic year, The Gateway is set to become a hub for innovation and interdisciplinary research, addressing some of society's greatest challenges through education and data science.

 

About Our Host

A special thank you to Turner Construction for hosting this project tour for our community.

 

Still have questions?

Please reach out to Laith Nuqul at lnuqul@buildoutalliance.org with questions or for more information.

 
Previous
Previous
September 12

Being Queer in Architecture, Engineering, and Construction

Next
Next
September 16

Book Club: Tales of the City by Armistead Maupin